Often when we find two separate structures joined together, we encounter leaks.  Here we came up with a solution for a specific problem.

The water was entering at the poorly constructed junction on the left.  So we removed four courses of roof tiles and poured a reinforced cement maintenance access walkway.  Next we filled in the joint with acrylic cement and topped it off with a membrane and two coats of impermiablizante. 

Make a free website with Yola